Pre-manufacturing (2D primary structural systems)
Modern Methods of Construction, Introducing the MMC definition framework, published by Ministry of Housing, Communities & Local Government (MHCLG) in 2019 defines 7 categories for MMC:
- Category 1 – Pre-manufacturing (3D primary structural systems).
- Category 2 – Pre-manufacturing (2D primary structural systems).
- Category 3 – Pre-manufacturing components (non-systemised primary structure).
- Category 4 – Additive manufacturing (structural and non-structural)
- Category 5 – Pre-manufacturing (non structural assemblies and sub-assemblies).
- Category 6 – Traditional building product led site labour reduction / productivity improvements.
- Category 7 – Site process led site labour reduction / productivity / assurance improvements.
Category 2 – Pre-Manufacturing (2D primary structural systems) is defined as:
‘A systematised approach using flat panel units for basic floor, wall and roof structures of varying materials which are produced in a factory environment and assembled at the final workface to produce a final three-dimensional structure. The most common approach is to use open panels or frames, which consist of a skeletal structure only, with services, insulation, external cladding and internal finishing being installed on site.
‘More complex panels – typically referred to as closed panels – involve more factory-based fabrication and include lining materials and insulation. These may also include services, windows, doors, internal wall finishes and external claddings. The system includes structural performance for primary walls and all floors (note – this excludes unitised or composite external walling systems that are not load bearing included in Category 5).’
[edit] Related articles on Designing Buildings Wiki
- British post-war mass housing.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- MMC definition framework.
- Modern methods of construction.
- Off site, on track.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
- Pre-manufactured value
- Volumetric.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.


















Comments
This article is very informative, thank you for sharing helpful content